POPS® Smart & Switched PDU Adds Per Outlet Power Sensing (POPS) to Smart or Switched PDUs to provide power monitoring per an individual outlet/device. Power information per individual outlet /device includes current, voltage, power (kW), apparent power, crest factor, and power factor. Using our grouping technology, power information is available per device, groups of devices (application), individual PDU or cabinet.

PRO2™ HDOT® 11.0kW - 22.0kW (36-42) outlets |

Family Specifications |
Product Specifications |
C2SG36CE-4PAF2M00 (SMART POPS) DOWNLOAD DATASHEET |
C2SG36CE-4PAF2M66 (SMART POPS) DOWNLOAD DATASHEET |
Drawings |
Design Diagram - DD 412-0983-42H
Wiring Diagram - WD 495-0983-42H
Visio Drawing - Pro2 HDOT.vss
Documents |
Firmware
Manual
UG - C2S Series Smart PRO2 – User Guide (Firmware Version 8.0)
UG - C2W Series Switched PRO2 – User Guide (Firmware Version 8.0)
Application Notes
AN PRO2-001: How do I maximize uptime using power data from the equipment cabinet?
AN PRO2-002: How do I use a cabinet PDU to help manage equipment deployment?
AN SPM-001: How do I leverage cabinet PDU information to help plan for growth?
AN HDOT Smart PDU’s Power Cisco’s Unified Computing System
AN HDOT-001: How do I maximize the number of devices in my small 24"x 42U cabinets?
AN HDOT-004: How do I provide 10kW in a rack with only single-phase power available?
AN PRO2-003: How do I get performance metrics from non-intelligent power supplies?
AN SPM-001: How do I leverage cabinet PDU information to help plan for growth?
Technical Notes
TN - About "Bluetooth Ready" (303-9999-40)
TN - CDU Firmware Upgrade Instructions (303-9999-35)
TN - CDU Security (303-9999-12)
TN - Introducing PRO1 (303-9999-41)
TN - Using LDAP with Sentry Firmware and Sentry Power Manager (SPM) (303-9999-30)
TN - Using StartUp Stick for CDU Mass Configuration (303-9999-34)
TN - About "Bluetooth Ready" (303-9999-40)
TN - CDU Firmware Upgrade Instructions (303-9999-35)
TN - CDU Security (303-9999-12)
TN - Introducing PRO1 (303-9999-41)
TN - Using LDAP with Sentry Firmware and Sentry Power Manager (SPM) (303-9999-30)
TN - Using StartUp Stick for CDU Mass Configuration (303-9999-34)
White Papers
WP - Advances in Power and Environmental Monitoring for Increasing Efficiency in the Data Center
WP - Bottom-Up Data Center Power Management
WP - Managing variable data center rack densities
WP - Mission Critical - Rack Power Distribution
WP - Power Distribution as a System within the High-Density Data Center
WP - The Practical Science of Data Center Capacity Planning
WP - Advances in Power and Environmental Monitoring for Increasing Efficiency in the Data Center
WP - Bottom-Up Data Center Power Management
WP - Managing variable data center rack densities
WP - Mission Critical - Rack Power Distribution
WP - Power Distribution as a System within the High-Density Data Center
WP - The Practical Science of Data Center Capacity Planning
Compliance
Warranty